Not sure if this is correct location for this type of issue, but here goes....
We have an existing requisition release strategy with classification which includes limited characteristics (e.g., acct assignment category, PGrp (represents function), MRP controller (type of material), creation indicator (MRP vs other), and value. We use this with workflow.
We now have a request to add a G/L account based prerequisite to this strategy. Issue is that the G/L account monetary threshold is different than the existing value.
First, is this possible? If so, please explain.